Often I hear people say that retrospectives are useless, boring & take too long.
This means that its not done right; do it right and get some value from it :)
The difference between a good & a bad retrospective?
The structure and the facilitation.
Retrospectives are the strongest tools in the agile toolbox and an important part of continuously inspect & adapt.
I will talk about the structure of a good retrospective and important principles to follow to get a good retrospective every time.